Latest Updates :

अब लोडसेडिङ तालिका आउँदैन्, बरु जेल जान्छु तर जनतालाई बिजुली दिन्छु: कुलमान घिसिङ - भिडियो हेर्नुहोस उनि यसरि कडा रुपमा प्रस्तुत भए भिडियो सहित


SHARE THIS POST :

Kulman Ghising, official executive, Nepal Electricity Authority, who is standing out as truly newsworthy the nation over for his crusade to end powercuts in Kathmandu, on Sunday discussed arrangements to fabricate the approximately 700-MW Dudhkoshi Hydropower Project utilizing Nepali capital, much the same as the 456-MW Upper Tamakoshi extend. Ghising educated about the arrangement to build up the venture, which is to be situated in eastern Nepal, utilizing stores gathered from the general population of Khotang locale and different Nepalis. The Asian Development Bank is setting up a nitty gritty venture report, he said, including that simply like Tamakoshi, NEA has arranged a draft get ready for the foundation of an organization for venture improvement.


SHARE THIS POST :

Post a Comment

bbc

 
Support : Creating Website | Johny Template | Mas Template
Copyright © 2011. Nepal 1TV - All Rights Reserved
Template Created by Creating Website Published by Mas Template
Proudly powered by nepal1tv